Sadara Chemical Complex Project – Jubail, Saudi Arabia
ABM International supported project execution through the deployment of skilled manpower across mechanical, piping, fabrication, welding, electrical, instrumentation, and construction disciplines during the development of the Sadara petrochemical complex in Jubail Industrial City II, Saudi Arabia.
Sadara Chemical Company
ClientSaudi Aramco & Dow
Joint Venture$20 Billion
Project Value6 km²
Complex Area2020
Completion
Building One of the World's Largest Integrated Chemical Complexes
The Sadara Chemical Complex is one of the largest petrochemical developments ever constructed in Saudi Arabia. Located in Jubail Industrial City II on the Kingdom's eastern coast, the project was developed as a joint venture between Saudi Aramco and Dow to establish a world-class chemicals manufacturing hub.
Construction commenced in 2011 with the objective of transforming Saudi Arabia's downstream manufacturing capabilities through the production of high-value specialty chemicals and performance materials. The project introduced advanced chemical manufacturing technologies to the Kingdom while supporting long-term industrial diversification and economic development objectives.
ABM International contributed by supplying skilled manpower across mechanical, piping, fabrication, welding, electrical, instrumentation, and construction disciplines during project execution.
$300M
Project Value75 MMSCFD
Gas Processing Capacity4,500 BPD
Condensate Output2013–2016
Execution PeriodWorkforce deployment & specialized manpower support.
ABM International supplied skilled manpower across Mechanical & Pipeline, Plant & Machinery, and Hydrotest & Survey disciplines supporting critical gas infrastructure construction activities.

Mechanical & Pipeline
Skilled manpower supporting pipeline construction, welding, fitting, fabrication, coating and mechanical installation activities for gas infrastructure development.
2013 → 2016
From project award in 2013 to successful completion in late 2016, the Sadara Gas Pipeline Project strengthened Saudi Arabia's regional energy infrastructure.
Project Awarded
Saudi Aramco awarded the approximately $300 million Sadara Gas Project contract to Larsen & Toubro (L&T).
Engineering & Construction
Engineering, procurement, and construction activities commenced across the project facilities.
Peak Execution Phase
Pipeline installation, mechanical works, hydrotesting, and commissioning activities reached peak progress.
Project Completion
The Sadara Gas Project was successfully completed and commissioned for operation.
Delivering Skilled Workforce Support for Saudi Arabia's Strategic Gas Infrastructure
ABM International supported Larsen & Toubro (L&T) throughout the execution of the Sadara Gas Pipeline Project by deploying experienced technical manpower across pipeline construction, welding, mechanical works, hydrotesting, survey operations, and heavy equipment activities. Our workforce contributed to the successful delivery of one of Saudi Aramco's key regional energy infrastructure projects.
Supporting Strategic Gas Infrastructure
ABM International supplied skilled manpower for the Sadara Gas Project, supporting the construction of strategic gas infrastructure that enabled the transportation and utilization of sweet gas(sulphur-free) for regional power generation.
Enabling Cleaner Energy Transition
The project was designed to replace crude oil and diesel consumption with cleaner natural gas. ABM-supported personnel contributed to the successful execution of infrastructure works that helped advance Saudi Arabia's environmental and energy optimization objectives.
Supporting Reliable Pipeline Operations
The Sadara system incorporates dual-pipeline architecture, allowing continuous operation and enhanced system reliability. ABM provided workforce support across project execution phases, helping maintain construction quality and operational readiness for this strategically important gas network.
Contributing to Long-Term Regional Development
By supporting L&T during the execution of the Sadara Gas Project, ABM International contributed to infrastructure that strengthens power supply for the Tabuk and Duba regions while supporting the broader economic development goals associated with Saudi Arabia's Vision 2030 initiatives.